Reference - po področjih uporabe

Področje uporabe izberi:
Izberi referenco: Deutschland, Groß Rohrheim, Schacht in der Neugasse
Bulgaria, Belitza, Dancing Bears Park
China, Beijing, Wangjing, Sewage tank
China, Shanxi, Majiakou Pipeline
Greece, Athens, Sewage treatment plant
Iran, Acid Tank
Iran, Fajr Petrochemical, sewage treatment plant
Iran, Kish Island, Dolphin Park
Iran, Mix Tank
Iran, Sari City
Iran, Sewage Pipe
Iran, Tehran, Swimming pool
Lithuania, Sewage Water Reservoir, Mars Lietuva
Poland, Zgierz, Sewage treatment plant
Saudi Arabia, Jeddah, Essa Bin Laden Hospital
Saudi Arabia, Jeddah, Sewage Water Tank
Saudi Arabia, Jeddah, Swimming Pool
Saudi Arabia, Marble Factory, Water tank
Serbia, Pecinci; Sugar Refinery, 'Donji Srem'
Serbia, Smederevo, Hotel "Car"
South Africa, Pitsburg, Drinking Water Reservoir
Turkey, Istanbul, Esas Business Park
Turkey, Pasaköy - biological sewage treatment plant
Latvia, CEMEX
USA, Las Vegas, The MGM Grand
USA, Long Beach, CA, World Trade Center
USA, Los Angeles, CA, Broadway State Office Building
USA, Los Angeles, CA, Southwest Museum
USA, Los Angeles, CA, Subway Terminal Building
USA, North Hollywood, CA, Universal City Studios Theme Park
USA, Pasadena, CA, Caltech Millikan Library
China, Beijing, Olympiahalle
Deutschland, Aurich, Abwasserschacht
Deutschland, Berlin, Amerikanische Botschaft
Deutschland, Berlin, Olympiastadion
Deutschland, Denkershausen, Trinkwasserspeicher
Deutschland, Jagel, Nato-Flugplatz
Deutschland, Kiel, Schachtsanierung
Deutschland, Kloster Dalheim
Polen, Tarnów, Trinkwasserbehälter
Cyprus, Noah's Ark Hotel
Portugal, Leiria, Water tank
Serbia, Smederevo, Olympic Swimming Pool
Turkey, İzmir, Optimum Shopping Center
Latvia, Ventspils, NAFTA Terminals
Latvija, Rīgas ūdens
Polska, Kraków, Apartamentowce "Tarasy Verona"
Polska, Tarnów, Zbiornik wody pitnej
Polska, Zgierz, Oczyszczalnia Ścieków
Portugal, Leiria, ROCA

Portugal, Leiria, Water tank

Objekt Water tank, Leiria, Portugal 
Področja uporabe Specialne izolacije
Izolacija rezervoarjev in kanalov
 
Opis Underground concrete reservoir waterproofing, previously made with plastic membrane that was falling to pieces. The walls were clean with water at 400 bar pressure, cleaned and repaired with repair mortar. After curing time, 3 layers of NB1 Grey were applied in 3,5 kg/m2. After the NB1 Grey, there was curing time of 15 days, before start filling the reservoir. Hot drinking water cylindric tin cans for the production of ceramic, had an epoxy coating with about 6 years old, that was failing and leaving small particles in the water. All the cylinders were sand blasted inside, and 2 layers of Corrosion Protection were applied in 1 kg/m2. Safe curing period of 8 days.  
Uporabljeni proizvodi KÖSTER Corrosion Protection
KÖSTER NB 1 siv
KÖSTER Tesnilna malta
 
Izvajalec ROCA